BUILDING BY DESIGNING
Building by designing is usually more cost-efficient than ready-to-move building. In building by designing, the project manager takes care of the entire building site, including subcontractor schedules and the quality of the work. Ask about additional building-by-designing possibilities from a Polar Life Haus representative.